Termite Control

Pre-construction and post-construction termite control solutions to permanently protect your structures from termite damage.

Pre-Construction Termite Treatment

Pre-Construction Termite Treatment

Our pre-construction (pre-site) termite treatment creates an impenetrable chemical barrier in the soil before your foundation is laid. We treat the excavated ground, foundation trenches, and backfill areas with long-lasting termiticides that prevent subterranean termites from ever reaching your structure. This is the most cost-effective time to protect a building — preventing damage before it can begin. Ideal for new builds, extensions, and renovations.

Post-Construction Termite Treatment

Post-Construction Termite Treatment

For existing structures already under termite attack, we drill and inject termiticide into the foundation perimeter, around pillars, and along affected walls. This creates a protective zone that eliminates active colonies and prevents re-infestation. We also treat wooden structures, door frames, and roof trusses directly. Our post-site treatments come with a service guarantee, giving you peace of mind that your investment is protected.

FAQ & Client Feedback

Questions & Reviews

Frequently Asked Questions

What Our Clients Say

We hired Spotpest for pre-site treatment on our new apartment complex. Their team was thorough and professional. Two years later, zero termite issues. Great investment.

E

Eng. David O.

Karen, Nairobi

Termites had damaged our door frames badly. Spotpest drilled and treated the entire perimeter — the problem stopped completely. Very knowledgeable team.

S

Susan W.

Kileleshwa, Nairobi

Ready to Solve Your Termite Problem?

Don't wait until the problem gets worse. Contact our expert team today for a free inspection and customized treatment plan.

Contact us